90kW Synergy Manager SWITCH DC Switch, MC4, DC SPD
Part No: SE-90000-SWITCH-FULL
Supplier: SolarEdge
Category: Inverters - Main Unit
Three Phase Synergy Inverter
Main features:
- Pre-commissioning feature for automated validation of system components and wiring during the site installation process and prior to grid connection.
- Easy 2-person installation with lightweight, modular design (each inverter consists of 2 or 3 Synergy Units and one Synergy Manager).
- Independent operation of each Synergy Unit enables higher uptime and easy serviceability.
- Built-in thermal sensors detect faulty wiring ensuring enhanced protection and safety.
- Built-in arc fault protection and optional rapid shutdown (depending on Synergy Manager used)
- Built-in PID mitigation for maximized system performance.
- Monitored and field-replaceable surge protection devices: integrated RS485 and Type 2 DC SPDs, optional Type 2 AC SPD.
- Integrated DC safety switch eliminates the need for external DC isolators.